Advertisement

 
 
Installation Guide v1.0
DCU12
 
READ ME FIRST!
This document does not replace the MFD
Installation Guide. It only contains information
specific to the DCU12
www.furunousa.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DCU12 and is the answer not in the manual?

Questions and answers

Summary of Contents for Furuno DCU12

  • Page 1     Installation Guide v1.0 DCU12   READ ME FIRST! This document does not replace the MFD Installation Guide. It only contains information specific to the DCU12 www.furunousa.com...
  • Page 2 The DCU12 combines a high resolution 12 inch screen and a keyboard into a compact layout . The DCU12 needs to be connected to a MFDBB processor unit (this is not a self contained unit like the MFD12 or MFD8). The DCU12 can be used with or without the MCU001 (MFDBB Keyboard).
  • Page 3 Power Synchronization feature. The number on each DIP switch corresponds to the port number. When connecting the DCU12 to the MFDBB processor, you must use Port 1 or Port 2. Make sure that the corresponding DIP switch inside the MFDBB is turned ON.
  • Page 4 Simultaneously press and hold the Left key of the Scrolling Pad, the Right key of the Cursor pad and push the RotoKey for 5sec. (This intentionally requires two hands) The DCU12 will beep two times. You can release the button at this time. The DCU12 will now control the MFDBB.

Table of Contents