3Com Powerware Uninterruptible Power System Prestige Series Installation And Operator's Manual page 42

3000 va, 200-240v
Table of Contents

Advertisement

Installation
Use the following procedure to install the UPS and battery cabinets with
the PPDM:
36
Powerware
1. Place the UPS near the equipment to be protected. The UPS
should be well ventilated and away from direct sunlight or
other heat source.
Place the UPS and battery cabinets on top of or beside the
PPDM as shown in Figure 4.
NOTE You can install additional battery cabinets while the UPS is operating, but
confirm the UPS is not in Battery mode (see page 49).
UPS
Cabinet
Battery
Cabinet
PPDM*
*NOTE: The IEC 320-C13 PPDM should
be placed on top of the UPS cabinet.
2. Verify the circuit breaker on all battery cabinets is in the
OFF (O) position.
3. Remove the battery connector guard. Plug the battery cord into
the external battery connector on the UPS. All battery
connectors are polarized to prevent incorrect connection.
4. If additional battery cabinets are to be used, plug the battery
cord of the second cabinet into the external battery connector
of the first battery cabinet. Follow this procedure for each
additional battery cabinet.
5. Remove the breaker tie from the circuit breaker on all battery
cabinets.
6. Switch the circuit breaker on all battery cabinets to the ON (
position.
®
Prestige Series Installation and Operator's Manual for IBM Applications (3000 VA) Uncontrolled Copy
Air Vents
PPDM
Figure 4. Cabinet Setup
Battery
UPS
Cabinet
Cabinet
)
|

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerware prestige series

Table of Contents