Installing Leveling Legs And Coin Box - Maytag MDE18PD Installation Instructions Manual

Commercial gas or electric dryer
Hide thumbs Also See for MDE18PD:
Table of Contents

Advertisement

Available languages

Available languages

INSTALLING LEVELING LEGS AND COIN BOX

The console houses the electronic control board. The board is
factory set for a dry time of 45 minutes. Consult the tech sheet
found inside the dryer toe panel to reset dry time and for other
options.
The card reading mechanism is not included, but is available from
your usual industry sources.
1. Prepare dryer for leveling legs
NOTE: Slide dryer onto cardboard or hardboard before moving to
avoid damaging floor covering.
Using two or more people, move dryer to desired installation
location.
Take tape off front corners of dryer. Open dryer and remove
the literature and parts packages. Wipe drum interior with a damp
cloth to remove any dust.
Take two cardboard corners from the dryer carton and place them
on the floor in back of the dryer. Firmly grasp the body of the dryer
and gently lay it on its back on the cardboard corners. Disconnect
power before making electrical connections.
(appearance may vary)
2. Screw in leveling legs
Examine leveling legs and find diamond
marking. Screw legs into leg holes by
hand. Use an adjustable wrench or
25 mm (1") hex-head socket wrench
to finish turning legs until diamond
marking is no longer visible. Then fit
a covered foot boot over each leg foot.
To protect the floor, use a large piece of cardboard from the dryer
carton. Stand dryer up on the cardboard. Slide the dryer until
it is close to its final location. Leave enough room for electrical
connection and to connect the exhaust vent.
16
The meter case houses the factory-installed accumulator timer with
actuating arm or service switch.
The service door lock and key and coin box lock and key may not
be included but are available from the usual industry sources.
1. Install coin box
Remove the service door of the meter case by lifting it up at the
back. Install the money-accepting device. (Refer to manufacturer's
instructions for proper installation.)
Replace the meter case service door. Put the coin vault with lock
and key in the meter case opening.
Remove cardboard or hardboard from under dryer. Adjust the legs
of the dryer up or down until the dryer is level.
2. Install added security device
Check that power is not supplied to the dryer.
Open and remove the service door.
Insert the narrow part of the security cone into the oblong hole in
the bottom rear of the meter case assembly.
Pass the security bolt through this cone and thread it by hand into
the cage nut below the oblong hole.
Tighten the security bolt by hand a few turns before using a wrench
to tighten until snug.
Diamond
Marking
NOTE: Installing the security bolt provides added security, but
will add to the service time when the top needs to be removed for
Foot
servicing the dryer.
Security
security
Bolt
bolt
Security
security
Cone
cone
Cage
cage nut
Nut

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mdg18pd

Table of Contents