E. CHECKING BURNER INPUT
1. Refer to rating label mounted on the jacket top panel
to obtain the rated BTU per hour input. In no case
shall the input to the boiler exceed the value shown
on the rating label.
2. Check input by use of the following formulas
(manufacturer suggests reading meter for 2 Cu. Ft.):
U.S. Customary Units
Input (BTU/Hr.)= 3600 x F x H
Where:
3600 = Seconds per hour
F = Cubic Feet of Gas Registered on Meter
H = Heat Value of Gas in BTU/Cubic Feet
T = Time in Seconds the Meter is Read
SI Metric Units
Input (kW)= 3600 x F x H
Where:
3600 = Seconds per hour
3.6 = Megajoule (MJ) per kilowatt hour (kwhr)
F = Cubic Meters of Gas Registered on Meter
H = Heating Value of Gas in MJ/Cubic Meter
T = Time in Seconds the Meter is Read
3. As an alternative, use Table 7.1(a) and 7.1(b). Use
the heating value provided by gas supplier. Use a
stopwatch to record the time it takes for 2 cubic feet
(0.0566 cubic meter) of gas to pass through the
meter. Read across and down to determine rate.
Table 7.1a: Meter Conversion – Natural Gas
(U.S. Customary Units)
Burner inputs in Btu/hr for various meter timings and heat
values. (Table based on 2 cubic feet of gas through meter).
Time that
meter is
read (sec)
1000
25
288000
240000
30
35
205714
40
180000
45
160000
50
144000
55
130909
60
120000
65
110769
70
102857
75
96000
80
90000
85
84706
90
80000
95
75789
100
72000
105
68571
110
65455
115
62609
120
60000
125
57600
INSTALLATION AND OPERATING INSTRUCTIONS
T
T x 3.6
Heat Value of Gas
(Btu/cubic foot)
1025
1050
295200
302400
246000
252000
210857
216000
184500
189000
164000
168000
147600
151200
134182
137455
123000
126000
113538
116308
105429
108000
98400
100800
92250
94500
86824
88941
82000
84000
77684
79579
73800
75600
70286
72000
67091
68727
64174
65739
61500
63000
59040
60480
Table 7.1b: Meter Conversion – Natural Gas
(SI Metric Units)
Burner inputs in kW for for various meter timings and
heat values. (Table based on 0.0566 cubic meter of gas
through meter).
Time that
meter is
read (sec)
37.26
25
84.36
30
70.30
35
60.25
40
52.72
45
46.86
50
42.18
55
38.34
60
35.15
65
32.44
70
30.13
75
28.12
80
26.36
85
24.81
90
23.43
95
22.20
100
21.09
105
20.08
110
19.17
115
18.34
120
17.57
125
16.87
F.

CHECK-OUT PROCEDURE

1. After starting the boiler, be certain all controls are
working properly. Check to be sure that the limit will
shut off the boiler in the event of excessive water
temperature. This can be done by lowering the limit
setting until the main burners shut down. When
proper limit function is confirmed, return the dial to
its previous setting.
2. To check operation of the ignition system safety
shut-off features:
a. Standing Pilot:
i) Turn the gas control knob counterclockwise to
"PILOT". The main burner should go out
and the pilot should remain lit.
ii) Extinguish the pilot flame. Pilot gas flow
should stop within 2-1/2 minutes. Complete
shutdown is proven since the safety shut-off
valve has stopped main and pilot gas flow.
iii) Reset the boiler by following Lighting
Instructions.
iv) Observe boiler operation through one
complete cycle.
Heat Value of Gas
(MJ/cubic meter)
38.19
39.12
86.46
88.57
72.05
73.81
61.76
63.26
54.04
55.35
48.03
49.20
43.23
44.28
39.30
40.26
36.03
36.90
33.25
34.06
30.88
31.63
28.82
29.52
27.02
27.68
25.43
26.05
24.02
24.60
22.75
23.31
21.62
22.14
20.59
21.09
19.65
20.13
18.80
19.25
18.01
18.45
17.29
17.71
25