Smith GBX 70 Installation And Operation Instructoins page 14

Table of Contents

Advertisement

14
INSTALLATION AND OPERATING INSTRUCTIONS
Table 5.1:
Boiler – Natural Gas
Size
Cubic Feet / Hour
70
70
105
105
140
140
175
175
195
195
Table 5.2:
Boiler – LP Gas
Size
Cubic Feet / Hour
70
28
105
42
140
56
175
70
195
78
Table 5.3:
Pipe Capacity
Capacity of pipe of different diameters and lengths in cubic feet
per hour [cubic meter per hour] with a pressure drop of 0.3
inches of water (75 Pa) and specific gravity of 0.60. No
allowance for an ordinary number of fittings is required.
Pipe
Length in
3/4"
Feet
Pipe
[Meters]
10 [3.0]
278 [7.9] 520 [14.7] 1050 [29.7] 1600 [45.3]
20 [6.1]
190 [5.4]
350 [9.9]
30 [9.1]
152 [4.3]
285 [8.1]
40 [12.2]
130 [3.7]
245 [6.9]
50 [15.2]
115 [3.3]
215 [6.1]
60 [18.3]
105 [3.0]
195 [5.5]
Maximum Capacity Correction Factors for
Specific Gravity other than 0.60.
Specific Gravity
0.50 0.55 0.60 0.65 0.70 0.75
Correction Factor
1.10 1.04 1.00 0.96 0.93 0.90
Specific Gravity
0.80 0.85 0.90 1.00 1.10 1.20
Correction Factor
0.87 0.84 0.82 0.78 0.74 0.71
Specific Gravity
1.30 1.40 1.50 1.60 1.70 1.80
Correction Factor
0.68 0.66 0.63 0.61 0.59 0.58
Input
Cubic Meters / Hour
2.0
3.0
4.0
5.0
5.5
Input
Cubic Meters / Hour
0.8
1.2
1.6
2.0
2.2
1"
1-1/4"
1-1/2"
Pipe
Pipe
Pipe
730 [20.7]
1100 [31.1]
590 [16.7]
890 [25.2]
500 [14.2]
760 [21.5]
440 [12.5]
670 [19.0]
400 [11.3]
610 [17.3]

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gbx 140Gbx 105Gbx 175Gbx 195

Table of Contents