Drain Pipe Inspection; Visual Inspection Of Appliance; Gas Pressures And Soundness; Water Inhibitor Concentration - Biasi RIVA ADVANCE HE M110B.24SM/C User Manual And Installation Instructions

Wall hung, fanflue, roomsealed, high efficiency gas boiler
Hide thumbs Also See for RIVA ADVANCE HE M110B.24SM/C:
Table of Contents

Advertisement

MAINTENANCE

9.10 Drain pipe inspection

Check the soundness and integrity of the
condensate drain pipe.
Verify the cleaness and correct filling of the
condensate traps.

9.11 Visual inspection of appliance

Visually inspect all water joints, seals and
connections for any evidence of leakage
and retighten, grease or replace them as
necessary.

9.12 Gas pressures and soundness

Check appliance for gas soundness. Re-
check operational pressures as described
in section "Checking the gas supply pres-
sure" to page 45.

9.13 Water inhibitor concentration

Where chemical products are used the level
of water treatment should be checked on an
annual basis and re treated after full or par-
tial drain down. A conductivitymeter can be
used to check the correct concentration of
inhibitor in the heating water.
- 56 -

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Riva advance he m110b.32sm/c

Table of Contents