Using The Boiler - Biasi RIVA ADVANCE HE M110B.24SM/C User Manual And Installation Instructions

Wall hung, fanflue, roomsealed, high efficiency gas boiler
Hide thumbs Also See for RIVA ADVANCE HE M110B.24SM/C:
Table of Contents

Advertisement

The manual must be read thoroughly, so that you will be able to use the boiler in a safe
and sensible way; must be carefully kept. It may be necessary for reference in the future.
The lighting up must be carried out by competent and responsible engineer.
The manufacturer
• disclaim all liability for any translations of the present manual from which incorrect inter-
pretation may occur;
• cannot be held responsible for non-observance of instructions contained in this manual
or for the consequences of any procedure not specifically described.
Please ensure that the installer has fully completed the Benchmark Checklist on the inside
back pages of the installation instructions supplied with the product and that you have signed
it to say that you have received a full and clear explanation of its operation. The installer is
legally required to complete a commissioning checklist as a means of complying with the
appropriate Building Regulations (England and Wales).
All installations must be notified to Local Area Building Control either directly or through a
Competent Persons Scheme. A Building Regulations Compliance Certificate will then be
issued to the customer who should, on receipt, write the Notification Number on the Bench-
mark Checklist.
This product should be serviced regularly to optimise its safety, efficiency and performance.
The service engineer should complete the relevant Service Record on the Benchmark
Checklist after each service.
The Benchmark Checklist will be required in the event of any warranty.
Before lighting the boiler you are advised to have a Gas Safety Registered Engineer
check that the installation of the gas supply
• is gas-tight;
• is of the correct gauge for the flow to the boiler;
• is fitted with all the safety and control devices required by the current Regulations.
Ensure that
• Check with the Installer that he has connected and terminated the pressure relief valve
in a manner which allows safe discharge. The manufacturers are not responsible for
damage caused by opening of the pressure relief valve and consequent escape of wa-
ter, if this is not connected and terminated.
• The installer has connected the condensate outlet to a suitable drain pipe.
Remember that...

Using the boiler...

- 3 -

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Riva advance he m110b.32sm/c

Table of Contents