Conversion To Another Gas; Levelling; Fitting The Handles And Handrail; Fitting The Splashback - Rangemaster Professional+ 100 Dual Fuel FSD User Manual

Table of Contents

Advertisement

INSTALLATION
Check the appliance is electrically safe and gas sound when you have finished.
As you progress, make sure that both the electricity cable and
Fig.7-9
gas hose always have sufficient slack to allow the cooker to
750
move.
A
500
With a stability chain fitted, release it as you ease the cooker out.
Do not forget to refit it when you replace the cooker.
Gas inlet
When you replace the cooker, again check behind to make
sure that the electricity cable and gas hose are not caught or
trapped.

Conversion to Another Gas

If the appliance is to be converted to another gas do the
conversion at this point. See the conversion section of these
680
instructions and see the instructions in the conversion kit.
450

Levelling

You are recommended to use a spirit level on a shelf in one of
the ovens to check for level.
All dimensions in millimetres
Place the cooker in its intended position taking care not to
twist it within the gap between the kitchen units as damage
may occur to the cooker or the units.
The front feet and rear rollers can be adjusted to level the
cooker. To adjust the height of the rear of the cooker use the
levelling tool supplied to turn the adjusting nuts at the front
bottom corners of the cooker. To set the front turn the feet
bases to raise or lower.

Gas Connection

This must be in accordance with the relevant standards.
The flexible hose (not supplied with the cooker) must be
in accordance with the relevant standards. Hoses may be
purchased at most builders' merchants.
We recommend that a Micropoint gas hose is used when
installing this appliance.
The gas supply needs to terminate with a side facing elbow
with a downward facing bayonet.
The connector is located just below the hotplate level at the
rear of the cooker. If in doubt contact your supplier.
The rear cover boxes limit the position of the supply point.
Because the height of the cooker can be adjusted and
each connection is different, it is difficult to give precise
dimensions.
Although a 900 mm hose can be used, a 1100 mm hose
will allow slightly more flexibility in the positioning of the
bayonet and make moving the cooker easier.
The hose should be fitted so that both inlet and outlet
connections are vertical so that the hose hangs downwards in
a 'U' shape.
Ideally the hose supply connection should be within the
shaded area 'A' shown (Fig.7-9).
For Natural Gas, the flexible hose must be in accordance with
BS 669. For LP Gas, it should be capable of 50 mbar pressure,
70 °C temperature rise, and carry a red stripe, band or label. If
in doubt contact, your supplier.
22

Advertisement

Table of Contents
loading

Table of Contents