Nordyne TC Series User Manual page 48

Two-stage condensing gas furnaces with fixed & variable speed blowers
Table of Contents

Advertisement

DOWNFLOW - 1 PIPE OPTIONS
COMBUSTION
AIR
Option
9
NOTE 5
See VIEW E for drain line positions
VIEW -E-
Inline Drain
(Factory Supplied)
See NOTE 4
Collector Box Drain
(Factory Equipped)
See NOTE 3
NOTES:
1. See Accessories section
(page
2. Drain line traps may be positioned inside or outside the cabinet.
3. All drain lines must be trapped with J-Trap or field supplied loop and drained externally from the cabinet.
4. Inline drain is required only if "X" is greater than 6 feet.
5. Horizontal piping from inducer to flue pipe must be sloped 1/4" per foot to ensure drainage to PVC trap.
DOWNFLOW - 2 PIPE OPTIONS
Flange
Plug
Option
12
See VIEW E for drain line positions
48
Rubber
Grommet
X
See
PVC Tee
PVC Trap
Rubber
Grommet
See VIEW F for drain line positions
Inline Drain
(Factory Supplied)
Drain Line (Field Supplied)
Attached to PVC Trap
18) for optional PVC Tee configurations and drainage options.
Rubber
Grommet
X
See
NOTE 5
PVC Tee
PVC Trap
Rubber
Grommet
See VIEW F for drain line positions
Figure 39. Downflow Options
COMBUSTION
AIR
Option
10
PVC Tee
PVC Trap
VIEW -F-
Drain Line
(Field Supplied)
Attached to
PVC Trap
Collector Box Drain
(Factory Equipped)
See NOTE 3
Flange
Option
13
PVC Tee
PVC Trap
COMBUSTION
AIR
Option
X
11
See
NOTE 5
Rubber
Grommet
See VIEW G for drain line positions
VIEW -G-
Collector Box Drain
Inline Drain
(Factory Equipped)
(Field Supplied)
See NOTE 3
See NOTES 3 & 4
Plug
Option
X
14
See
NOTE 5
Rubber
Grommet
See VIEW G for drain line positions
Flange

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tl series

Table of Contents