Vent Pipe Installation; Outdoor Terminations - Horizontal Venting - Nordyne TC Series User Manual

Two-stage condensing gas furnaces with fixed & variable speed blowers
Table of Contents

Advertisement

Vent Pipe Installation

CAUTION:
Combustion air must not be drawn from a
corrosive atmosphere.
This furnace has been certified for installation with zero
clearance between vent piping and combustible surfaces.
However, it is good practice to allow space for convenience
in installation and service.
• In the absence of local codes, the location of any
combustion air inlet relative to any vent terminal must
be at least 8 inches. This includes installations involving
more than one furnace.
• The quality of outdoor air must also be considered. Be
sure that the combustion air intake is not located near
a source of solvent fumes or other chemicals which
can cause corrosion of the furnace combustion system.
(See list of substances on
• Route piping as direct as possible between the furnace
and the outdoors. Horizontal piping from inducer to
the flue pipe must be sloped 1/4" per foot to ensure
condensate flows towards the drain tee or PVC trap.
Longer vent runs require larger pipe diameters. Refer
to the Inducer & Venting Options section on
for additional information.
• If a Direct Vent (2-pipe) system is used, the combustion
air intake and the vent exhaust must be located in the
same atmospheric pressure zone. This means both
pipes must exit the building through the same portion of
exterior wall or roof as shown in
• Piping must be mechanically supported so that its weight
does not bear on the furnace. Pipe supports must be
installed a minimum of every 5 feet along the vent run to
ensure no displacement after installation. Supports may
be at shorter intervals if necessary to ensure that there
are no sagging sections that can trap condensate. It is
recommended to install couplings along the vent pipe,
on either side of the exterior wall
couplings may be required by local code.
• If breakable connections are required in the combustion
air inlet pipe (if present) and exhaust vent piping, then
straight neoprene couplings for 2" or 3" piping with
hose clamps can be used. These couplings can be
ordered through your local furnace distributor. To install
a coupling:
1. Slide the rubber coupling over the end of the pipe that
is attached to the furnace and secure it with one of the
hose clamps.
2. Slide the other end of the rubber coupling onto the other
pipe from the vent.
3. Secure the coupling with the second hose clamp,
ensuring that the connection is tight and leak free.
12
page
5).
page 17
Figure 36 (page
45).
(Figure
36). These

Outdoor Terminations - Horizontal Venting

• Vent and combustion air intake terminations shall be
installed as depicted in
accordance with these instructions:
• Vent termination clearances must be consistent with the
NFGC, ANSI 2223.1/NFPA 54 and/or the CSA B149.1,
Natural Gas and Propane Installation Code.
(page 44)
lists the necessary distances from the vent
termination to windows and building air intakes.
• Vent and combustion air intake terminations must
be located to ensure proper furnace operation and
conformance to applicable codes. A vent terminal
must be located at least 3 feet above any forced air
inlet located within 10 feet. This does not apply to the
combustion air inlet of a direct vent (two pipe) appliance.
In Canada, CSA B149.1, takes precedence over these
instructions. See
Table
• All minimum clearances must be maintained to protect
building materials from degradation by flue gases as
shown in
Figure
7.
Figure 7. Inlet & Exhaust Pipe Clearances
Mechanical draft
vent terminal
NOTES:
1. All dimensions shown are
minimum requirements.
2. Exterior vent terminations must
be located at least 12" above the
maximum expected snow level.
Figure 8. Vent Locations
Figure 7
&
Figure 8
and in
Table 15
15.
Forced air inlet
Direct vent
terminal - more
than 50,000 Btuh