Horizontal Venting; Vertical Venting - Nordyne TC Series User Manual

Two-stage condensing gas furnaces with fixed & variable speed blowers
Table of Contents

Advertisement

HORIZONTAL VENTING

(2-Pipe Shown)
90°
Elbow
COMBUSTION AIR
See
Table 1
lengths (field supplied)

VERTICAL VENTING

(2-Pipe Shown)
Support System on
Vertical Rise
lengths (field supplied)
Couplings with 2
Hose Clamps (Optional)
Straps or Other Suitable
Supports at minimum of 5 ft. Intervals
90° Elbow
for 2" PVC pipe
to furnace connection as possible
PVC Tee
PVC Trap
First Support as Close
to Furnace as Possible
90° Elbow
(both ends)
PVC Tee
PVC Trap
Figure 36. Horizontal & Vertical Venting
Upward Pitch - 1/4" per foot
(Flue Pipe)
First support placed as close
Support System on
Vertical Rise
COMBUSTION AIR
See
Table 1
lengths (field supplied)
Seal/Caulk
Around Pipes
at Building
Elbow
7"
Wall
Normal
Snow Level
for 2" PVC pipe
PVC Tee
PVC Trap
90°
12" Min.
45

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tl series

Table of Contents