Lincoln Electric POWER MIG SVM167-A Service Manual page 56

Lincoln electric welder user manual
Table of Contents

Advertisement

F-20
TROUBLESHOOTING AND REPAIR
OUTPUT BRIDGE RECTIFIER TEST (continued)
TEST PROCEDURE
1. Remove input power to the POWER
MIG® 215 machine.
2. Using the 3/8" nutdriver, remove the left
case side.
3. Locate and disconnect the negative lead
from the output rectifier bridge assembly.
Be sure there is no electrical contact
between the rectifier and the lead. See
Figure F.6.
NOTE: Do not disassemble the rectifier
assembly.
4. Test for "shorted" or "leaky" diodes by
checking from the anodes to the cathodes
of the diode heatsink plates.
readings should be high resistance in
one polarity and low resistance in the
opposite polarity.
5. If any of the diodes are "leaky" or
"shorted" the output rectifier assembly
should be replaced.
6. When the test is complete, replace the
negative output lead previously removed.
7. Replace the left case side.
Figure F.6. Rectifier Test Points
Negative Lead
POWER MIG® 215
+
-
F-20
The

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power mig 215

Table of Contents