Site Requirements - Baxi 100 He Installation And Servicing Instructions

Wall mounted powered flue condensing boiler gas fired central heating unit
Hide thumbs Also See for 100 He:
Table of Contents

Advertisement

5mm Min
Fig. 12
500mm
For Servicing
Purposes
5mm
In Operation
Fig. 13
12
390mm
5mm Min
200mm
600mm
320mm

7.0 Site Requirements

7.1
Information
WARNING - Check the information on the data
plate is compatible with local supply conditions.
1. The installation must be carried out by a CORGI
Registered Installer or other registered competent
person and be in accordance with the relevant
requirements of the current G
and Use) R
EGULATIONS
(Scotland)(Consolidation), the L
R
, the current I.E.E. W
EGULATIONS
and the bye laws of the L
Where no specific instruction is given reference
should be made to the relevant BRITISH
STANDARD CODES OF PRACTICE. For Ireland
install in accordance with IS 813 "I
G
A
AS
PPLIANCES
to B
G
RITISH
AS
I
NSTALLATION OF
7.2
B.S. Codes of Practice
Standard
BS 6891
BS 5546
BS 5449 Part 1
BS 6798
BS 5440 Part 1
BS 5440 Part 2
BS 7074
50mm
BS 7593
WARNING - The addition of anything that may
interfere with the normal operation of the
appliance without the express written permission
of Baxi UK Limited could invalidate the appliance
warranty and infringe the G
(Installation and Use) R
7.3
Clearances (Figs. 12 &13)
1. A flat vertical area is required for the installation
of the boiler.
2. These dimensions include the necessary
clearances around the boiler for case removal,
spanner access and air movement. Additional
clearances may be required for the passage of
(1 in 20)
pipes around local obstructions such as joists
running parallel to the front face of the boiler.
3. For unventilated compartments see Section 7.5.
7.4
Location
1. The boiler may be fitted to any suitable wall with
the flue passing through an outside wall or roof and
discharging to atmosphere in a position permitting
satisfactory removal of combustion products and
providing an adequate air supply. The boiler should
be fitted within the building unless otherwise
protected by a suitable enclosure i.e. garage or
outhouse. (The boiler may be fitted inside a
cupboard - see Section 7.5).
2. If the boiler is sited in an unheated enclosure
then it is recommended to incorporate in the system
controls a suitable device for frost protection.
3. If the boiler is fitted in a room containing a bath or
shower reference must be made to the current
I.E.E. W
IRING
R
. If the boiler is to be fitted into a
EGULATIONS
building of timber frame construction then reference
must be made to the Institute of Gas Engineers
document UP 7.
S
(Installation
AS
AFETY
, the B
R
UILDING
EGULATIONS
B
OCAL
UILDING
R
IRING
EGULATIONS
W
U
OCAL
ATER
NDERTAKING
NSTALLATION OF
". Reference should also be made
G
N
F
T
UIDANCE
OTES
OR
HE
D
G
C
OMESTIC
AS
ONDENSING
Scope
Gas Installation.
Installation of hot water supplies for
domestic purposes.
Forced circulation hot water systems.
Installation of gas fired hot water boilers.
Flues.
Ventilation.
Expansion vessels and ancillary
equipment for sealed water systems.
Treatment of water in domestic hot water
central heating systems.
S
AS
AFETY
.
EGULATIONS
R
and B
EGULATIONS
UILDING
.
B
.
OILERS

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents