Baxi 100 He Installation And Servicing Instructions page 11

Wall mounted powered flue condensing boiler gas fired central heating unit
Hide thumbs Also See for 100 He:
Table of Contents

Advertisement

Pressure
Safety
Gauge
Valve
Expansion
Vessel
Boiler
System Drains
at Low Point
Fig. 11
Method of determining minimum valve of
Vessel Charge
Pressure (Bar)
0.5
1.0
1.5
Example :-
Table. 1
Then :-
Where a vessel of the calculated size is not obtainable
then the next available larger size should be used.
Stop
Valve
DHW
Mains
Fig. 11a
Inlet
Air
Vent
Filling
Point
Pump
Max Boiler Flow
Temp = 82° C
expansion vessel volume for sealed
systems using Baxi Boilers
Multiply Total
Initial System
Water Content
Pressure (Bar)
Of System By
0.5
1.0
1.5
2.0
1.0
1.5
2.0
1.5
2.0
System Volume = 75 litres
Vessel Charge Pressure = 1.0 bar
Initial System Pressure = 1.5 bar
75 x 0.152 = 11.4 litres
Expansion Vessel Volume
NOTE
Double
Stop
Check
Valve
Valve
Temporary
Hose
6.0 System Details
3 Litre
Top Up Bottle
(if required)
6.7
1. SAFETY VALVE - A safety valve complying with
the requirements of BS 6750 Part 1 must be fitted
close to the boiler on the flow pipe by means of a
horizontal or vertically upward connection with no
intervening valve or restrictions and should be
positioned to facilitate testing. The valve should be
pre-set and non-adjustable to operate at a pressure
of 3 bar (45 Ibf/in
Radiator
discharge any water or steam through a pipe to a
Circuit
safe outlet position.
2. PRESSURE GAUGE - A pressure gauge of
minimum range 0-4 bar (0-60 Ibf/in
pressure indicator must be fitted to the system,
preferably at the same point as the expansion
vessel in an easily visible position.
3. EXPANSION VESSEL - An expansion vessel
complying with the requirements of BS 4814 must
be fitted to the system by means of a connection
close to the inlet side of the circulating pump in
accordance with the manufacturers instructions, the
connecting pipe being unrestricted and not less
than 15mm (
vessel should be suitable for the system water
content and the nitrogen or air charge pressure
should not be less than the system static head (See
(Litres)
Table. 1).
0.067
0.112
Further details of sealed system design can be
0.207
obtained from BS 5449 and the British Gas
publication entitled 'Specifications for Domestic Wet
0.441
Central Heating Systems'.
0.087
4. FILLING POINT - A filling point connection on
0.152
the central heating return pipework must be
0.330
provided to facilitate initial filling and pressurising
and also any subsequent water loss replacement /
refilling. The filling method adopted must be in
0.125
accordance with the Water Supply (Water Fittings)
0.265
regulations and the Water Bylaws (Scotland). Your
attention is drawn to: Paragraph 24 of Schedule 2
Section 8 of the publication Water Regulations
Guide which gives recommendations and guidance
on approved methods for filling sealed systems.
The sealed primary circuits may be filled or
replenished by means of a temporary connection
between the primary circuit and a supply pipe
provided the arrangement in accordance with
Diagram R24.2a of the Water Regulations Guide.
The temporary hose must be completely removed
at both ends after use.
5. MAKE UP SYSTEM - A method of replacing
water lost from the system should be provided
either by means of a make up vessel of not more
than 3 litres (5 pints) capacity, mounted above the
highest point of the system, or by re-pressurisation
of the system.
6. VENTING - A method of venting the system
during filling and commissioning must be provided
by fitting automatic air vents or by venting
manually.
7. HOT WATER STORAGE - The hot water
storage vessel must be of the indirect coil type. All
CH
components used in the system must be suitable
Return
for operation at 110°C (230°F) and at the pressure
allowed by the safety valve.
Sealed Systems
(Fig. 11)
2
). It must be arranged to
2
) with a fill
1
/
in) nominal size. The volume of the
2
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents