Baxi 100 He Installation And Servicing Instructions page 33

Wall mounted powered flue condensing boiler gas fired central heating unit
Hide thumbs Also See for 100 He:
Table of Contents

Advertisement

Injector Pipe
Gas Valve
Securing Screws
Boiler Side
Fig. 58
Securing
Nut
Condensate
Trap
Sensor
Leads
Lock Nut
Condensate
Drain Pipe
H IG
H
LO
W
Case Pressure
Pipe
Gasket
Aluminium
Spacer
'O ring'
Electrical Plug
Nut Union
H IG
H
LO
W
Fig. 59
The removal of the fan is necessary to enable
the changing of the injector pipe, condensate
trap and gas valve (see section 13.9).
13.10
1. Remove the injector pipe by pulling out from
the 'O' ring joint in the gas valve.
2. Fit the new injector pipe and reassemble in
reverse order.
13.11
1. Release user interface and pivot downward for
better access.
2. Disconnect the gas inlet union at the gas tap.
3. Undo the case pressure pipe from the gas
valve.
4. Undo the screw and disconnect the electrical
plug from the gas valve.
5. Remove the two gas valve securing screws
from inside the air box holding the gas valve.
Gas Valve
6. Remove the gas valve from the airbox side.
7. Remove the nut union, aluminium spacer and
its gasket from the gas valve.
8. Fit the nut union, aluminium spacer and its
gasket to the new valve.
Gas Tap
9. Fit the new gas valve and reassemble in
reverse order.
13.12
1. Disconnect the condensate trap from the base
of the heat exchanger.
2. Disconnect the condensate drain (outside the
boiler) from the condensate trap.
3. Undo the condensate trap lock nut.
4. Remove the condensate trap from the boiler.
5. Disconnect the sensor leads.
Fit the new condensate trap and reassemble in
reverse order.
13.0 Changing Components
Injector Pipe (Fig. 58)
Gas Valve (Fig. 58)
Condensate Trap (Fig. 59)
33

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents