7.0 Site Requirements

7.1
1. The boiler may be fitted to any suitable wall with the
flue passing through an outside wall or roof and
discharging to atmosphere in a position permitting
satisfactory removal of combustion products and
providing an adequate air supply. The boiler should be
fitted within the building unless otherwise protected by
a suitable enclosure i.e. garage or outhouse. (The boiler
may be fitted inside a cupboard-see Section 7.3).
2. If the boiler is sited in an unheated enclosure then it is
recommended to leave the ON/OFF Selector Switch in
the domestic hot water and central heating position to
give frost protection.
780mm
3. If the boiler is fitted in a room containing a bath or
shower reference must be made to the relevant
requirements.
In GB this is the current I.E.E. Wiring Regulations and
Building Regulations.
In IE reference should be made to the current edition of
I.S. 813 "Domestic Gas Installations" and the current
ETCI rules.
4. If the boiler is to be fitted into a building of timber
frame construction then reference must be made to the
current edition of Institute of Gas Engineers Publication
IGE/UP/7 (Gas Installations in Timber Framed Housing).
7.2
1. A flat vertical area is required for the installation of
the boiler.
2. These dimensions include the necessary clearances
around the boiler for case removal, spanner access and
air movement. Additional clearances may be required
for the passage of pipes around local obstructions such
as joists running parallel to the front face of the boiler.
Location