General Layout - Baxi 100 He Installation And Servicing Instructions

Wall mounted powered flue condensing boiler gas fired central heating unit
Hide thumbs Also See for 100 He:
Table of Contents

Advertisement

2
3
4
5
6
7
Fig. 4
18
Fig. 5
1
H IG
H
L O
W
10
9
8

2.0 General Layout

2.1
1.
2.
3.
4.
5.
6.
7.
8.
17
16
9.
10.
11.
12.
13.
14.
15.
16.
17.
15
18.
14
2.2
13
KIT
FLUE EXTENSION KITS (110/70)
12
Flue Extension 0.25M
Flue Extension 0.5M
Flue Extension 1M
Flue Bend x 2 - 45°
Flue Bend - 90° (
VERTICAL FLUE (110/70)
Vertical Flue Terminal
Vertical Boiler Connection
CONTROL ACCESSORIES
11
Integral Electronic Twin Channel Timer Kit
Fig. 3
Layout (Figs. 3,4 & 5)
Wall Plate
Flue Elbow
Heat Exchanger
Burner
Air Box
Fan Protection Thermostat
Fan Assembly
Condensate Trap
User Interface (optional timer available)
Gas Tap
Gas / Air Ratio Valve
Electronics Housing
Transformer
Flow Pipe Connection
Return Pipe Connection
Flow Temperature Safety Thermostat - Black
Flow Temperature Thermistor - Red
Flow Switch (dry fire protection)
Optional Extras
(Use two kits for 2M etc.)
(Reduce overall length of flue
by 0.5m when fitting this bend)
Reduce overall length of flue
by 1m when fitting each bend)
PART N
o
241692
241694
241695
241689
241687
242802
242886
242834
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents