Introduction - Baxi Bermuda Inset 2 Boiler 50/4 Installation And Servicing Manual

Fireside gas central heating unit
Table of Contents

Advertisement

1.0
Introduction - Page 4
The boiler meets requirements of Statutory Instrument
"The Boiler (Efficiency) Regulations 1993 N° 3083" and
is deemed to meet the requirements of Directive
92/42/EEC on the efficiency requirements for new hot
water boilers fired with liquid or gaseous fuels.
Type test for purpose of Regulation 5 certified by:
Notified Body 0086.
Product/production certified by: Notified Body 0086.
"Benchmark" Log Book
As part of the industry-wide "Benchmark" initiative all
Baxi boilers now include an Installation, Commissioning
and Service Record Log Book. Please read the Log
Book carefully and complete all sections relevant to the
appliance and installation. These include sections on
the type of controls employed, flushing the system,
burner operating pressure etc. The details of the Log
Book will be required in the event of any warranty work.
Also, there is a section to be completed at each
subsequent regular service visit.
1.1 Description
1. The Baxi Bermuda Inset 2 is a combined central heating
boiler and gas fire designed for installation within a builders
opening in the living space of a dwelling.
2. The firefront is intended for hearth mounting.
3. These instructions relate to the central heating boiler
section of the appliance (Fig. 1).
4. The boiler is range rated, with outputs as shown:
5. The appliance is preset at its MIDRANGE heat input rate
and is designed for use on NATURAL GAS only. The boiler
is suitable for fully pumped and pumped central heating with
gravity hot water systems.
6. Sealed System applications require an optional overheat
thermostat kit.
1.2 Installation
1. The appliance is suitable for installation only in G.B. and
I.E. and should be installed in accordance with the rules in
force. For Ireland install in accordance with l.S. 813
"Installation of Gas Appliances".
2. The installation must be carried out by a CORGI
Registered Installer or other competent person and be in
accordance with the relevant requirements of Gas Safety
(Installation and Use) Regulations, the Building Regulations
(Scotland) (Consolidation), the Local Building Regulations,
the Current I.E.E. Wiring Regulations and the bye laws of the
Local Water Undertaking. Where no specific instructions are
given, reference should be made to the relevant B.S.
CODES OF PRACTICE.
3. All systems must be thoroughly flushed and treated
with inhibitor (see section 3.2).
1.3 B.S. Codes of Practice
4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents