Introduction - Baxi Bermuda Inset 2 Boiler 50/4 E Manual

Table of Contents

Advertisement

Baxi Bermuda Inset 2 Boiler 50/4 E
Fig. 1
The boiler meets requirements of Statutory Instrument
"The Boiler (Efficiency) Regulations 1993 N
is deemed to meet the requirements of Directive
92/42/EEC on the efficiency requirements for new hot
water boilers fired with liquid or gaseous fuels.
Type test for purpose of Regulation 5 certified by:
Notified Body 0086.
Product/production certified by: Notified Body 0086.
"Benchmark" Log Book
As part of the industry-wide "Benchmark" initiative
all Baxi boilers now include an Installation,
Commissioning and Service Record Log Book.
Please read the Log Book carefully and complete
all sections relevant to the appliance and
installation. These include sections on the type of
controls employed, flushing the system, burner
operating pressure etc. The details of the Log
Book will be required in the event of any warranty
work. Also, there is a section to be completed at
each subsequent regular service visit.
4
Supplied By www.heating spares.co Tel. 0161 620 6677
1.1
1. The Baxi Bermuda Inset 2 is a combined
central heating boiler and gas fire designed for
installation within a builders opening in the living
space of a dwelling.
2. The firefront is intended for hearth mounting.
3. These instructions relate to the central heating
boiler section of the appliance (Fig. 1).
4. The boiler is range rated, with outputs as
shown:
Model
50/4 E
5. The appliance is preset at its MIDRANGE
heat input rate and is designed for use on
NATURAL GAS only. The boiler is suitable for
fully pumped and pumped central heating with
gravity hot water systems.
6. Sealed System applications require an
optional safety limit thermostat kit (Baxi Part No.
245947).
1.2
o
3083" and
1. The appliance is suitable for installation only
in G.B. and I.E. and should be installed in
accordance with the rules in force. For Ireland
install in accordance with I.S. 813 "Installation of
Gas Appliances".
2. The installation must be carried out by a
CORGI Registered Installer or other competent
person and be in accordance with the relevant
requirements of Gas Safety (Installation and
Use) Regulations, the Building Regulations
(Scotland) (Consolidation), the Local Building
Regulations, the Current I.E.E. Wiring
Regulations and the bye laws of the Local Water
Undertaking. Where no specific instructions are
given, reference should be made to the relevant
B.S. CODES OF PRACTICE.
3. All systems must be thoroughly flushed
and treated with inhibitor (see section 3.2).
1.3

1.0 Introduction

Description
HEAT OUTPUT
Max
Mid
14.65kW
13.19kW
(50,000 Btu/h) (45,000 Btu/h) (40,000 Btu/h)
Installation
B.S. Codes of Practice
STANDARD
SCOPE
B.S. 6891
Gas Installation.
B.S. 5546
Installation of hot water supplies for
domestic purposes
B.S. 5449
Forced circulation hot water systems.
B.S. 6798
Installation of gas fired hot water
boilers.
B.S. 5440: Pt 1
Flues.
B.S. 5440: Pt 2
Air Supply.
B.S. 5871: Pt 1
Installation of fire/back boilers, gas
appliances.
B.S. 6500
Cables.
Min
11.72kW
1

Advertisement

Table of Contents
loading

This manual is also suitable for:

44 075 03

Table of Contents