Overheat Thermostat; Flue Connection; Completion - Baxi Bermuda Inset 2 Boiler 50/4 Installation And Servicing Manual

Fireside gas central heating unit
Table of Contents

Advertisement

5.0
Installation - Page 17

5.13 Overheat Thermostat

1. Where an overheat thermostat kit is required, the wiring
instructions supplied in the kit should be followed.
5.14 Flue Connection (Fig. 25)
1. If not already done so, fit the boiler hood now. Locate the
flue within the flue socket and secure with the three self
tapping screws provided in the kit.
2. Seal the flue against the flue outlet socket.

5.15 Completion

1. Seal off any secondary openings within the builders
opening after wrapping the gas and water pipes through the
brickwork and within the opening itself. (B.S. 5871 Part 1).
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents