A.
LOCATION AND LAYOUT
Figure 1 shows two different single gate installations. For location and layout details of Bi-Parting,
Bi-Parting Latch, Trap and Tandem gates, see Installation and Operation of Master/Slave Systems
for Series B1 Gate Operators Doc. No. 6001378, Part 1.
1. Always install the gate operator on the inside of the gate perimeter. NEVER install on the
public side of the perimeter.
2. All manual controls and activating devices should be mounted at least 6 ft. away from the gate
to provide safety.
3. Allow enough clearance around the gate and the gate operator for installation and service.
Rev C
PART 1
SITE PREPARATION
Figure 1. Barrier Gate Operator Layout.
NOTE
INSTALLATION NOTES
Doc 6001287 (01-20284)
3 of 40