Installation Standard Work Checklist - Harman P43 Installation Manual

Harman p43; p61a; p68 freestanding pellet stove
Table of Contents

Advertisement

Installation Standard work Checklist

This standard work checklist is to be used by the installer in conjunction with, not instead of, the instructions contained in
this installation manual.
Customer:
________________________________
Lot/Address: ________________________________
________________________________
Model: ________________________________
!
WARNING! Risk of Fire or Explosion! Failure to install appliance to these instructions can lead
to a fire or explosion.
Appliance Install
Required non-combustible floor protection
Verified clearances to combustible.
Unit is Leveled and secured.
Venting/Chimney Section 4 (Pg. 11-19)
Venting Configuration complies to vent diagrams.
Venting installed, sealed and secured in place with proper clearances.
Exterior wall/roof flashing installed and sealed
Terminations installed and sealed.
Electrical Section 1 (Pg. 5)
120VAC unswitched power provided to the appliance.
Appliance Setup Section 5 (Pg. 21-22)
All packaging and protective materials are removed
Accessories installed properly
Manual bag and all it's contents are removed from inside the appliance
and given to party responsible for use and operation
Started appliance and verified that all motors and blowers operate
as they should.
Hearth and Home Technologies recommends the following:
Photographing the installation and copying this checklist for your file.
This checklist remain visible at all times on the appliance until the installation is complete.
Comments: Further description of the issues, who is responsible (Installer/Builder/Other Trades, etc.) and corrective action
needed __________________________________________________________________________________________
_________________________________________________________________________________________________
_________________________________________________________________________________________________
Comments communicated to party responsible____________________ by ________________________ on __________
3
ATTENTION INSTALLER:
Follow this Standard Work Checklist
(Pg. 9)
(Pg. 11-14)
(Builder / Gen Contractor) (Installer)
Harman® • P-Series Installation Manual_R8 • 2014 - ___ • 04/15
Date Installed:
__________________________
Location of Stove:
__________________________
Installer:
__________________________
Dealer/Distributer Ph # __________________________
Serial Number:
__________________________
YES
IF NO, wHY?
________________________________
________________________________
________________________________
________________________________
________________________________
________________________________
________________________________
________________________________
________________________________
________________________________
________________________________
________________________________
(Date)
3-90-436168i

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

P61aP68

Table of Contents