Before You Start - Rinnai RF1200TW Operation & Installation Manual

Rinnai rf1200tw fireplace
Table of Contents

Advertisement

BEFORE YOU START

INSTALLATION REQUIREMENTS
This appliance MUST BE installed by an authorised person.
The installation MUST conform to local regulations.
The installation MUST also comply with the instructions supplied by Rinnai.
Service and removal MUST BE carried out by an authorised person.
CERTIFICATION
The Rinnai RF1200TW has been certified by the Australian Gas Association.
The Certification Number is shown on the appliance dataplate.
No parts or functions are to be modified or permanently removed from the heater.
Please keep these instructions in a safe place for future reference.
CARTON CONTENTS
The components for RF1200TW heater are supplied in separate cartons, the following table lists which components
are in each carton. Ensure that the components listed for the installation method being installed are present before
proceeding with the installation.
A
2
5
Item
Rinnai RF1200TW gas fire engine
1
Side reflector panels
2
Remote control (batteries supplied)
3
This operation and installation manual
4
Gas connection kit: 200mm 3/8 Flexi tube with plug and 3/8" - 1/2" reducing flare connector
5
Trim & hangers - 3 or 4 sided / Black or Stainless Steel (x2 - 1 trim required for each side)
6
Burner media - Pebbles, Crystals or Logs, Coals and Granules *
7
*
For details regarding Log, Coal and Granule quantities see "Logs, Coals and Granules" on page 23
Rinnai
1
3
4
Description
6
Two separarte trim sets are required for the appilaince,
one for the open side and one for the glass side.
(examples of 3 sided trims are shown)
2
6
7
Carton
A
RF1200TW OIM
B
C
B
C

Advertisement

Table of Contents
loading

Table of Contents