Carrier 58MEB Installation, Start-Up, And Operating Instructions Manual page 60

Deluxe 4---way multipoise fixed ---capacity condensing gas furnace sizes 040---120, series 100
Hide thumbs Also See for 58MEB:
Table of Contents

Advertisement

CHECKLIST—NON DIRECT VENT (1-PIPE) INSTALLATION
LOAD CALCULATION
__________
Heating Load (Btuh)
__________
Cooling Load (Btuh)
__________
Furnace Model Selection
VENT PIPING
Termination Location
__________
Roof or Sidewall
__________
Vent Pipe Length
__________
Vent Pipe Elbow Quantity
__________
Pipe Diameter Determined from Sizing Table
__________
Pipe Sloped To Furnace
Pipe Insulation
__________
Over Ceilings
__________
Low-Ambient Exposed Pipes
Copyright 2008 Carrier Corp. S 7310 W. Morris St. S Indianapolis, IN 46231
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
Condensate Drain
__________ Unit Level or Pitched Forward
__________ Internal Tubing Connections
__________ External Drain Connection Leak Tight and Sloped
__________ Condensate Trap Primed before Start-Up
__________ Heat Tape Installed if Required
CHECKLIST—START-UP
__________ Gas Input Rate
__________ Temperature Rise Adjusted
Thermostat Anticipator
__________ Anticipator Setting Adjusted or
__________ Cycle Rate (3 Cycles per Hr) Selected
Safety Controls Check Operation
__________ Primary Limit
__________ Pressure Switch
Printed in U.S.A.
Edition Date: 07/08
- - 60 - -
Free of Kinks and Traps
(Set Within 2 percent of Rating Plate)
Catalog No:58MEB --- 01SI
Replaces: NEW

Advertisement

Table of Contents
loading

Table of Contents