Air Ducts - Carrier 58MEB Installation, Start-Up, And Operating Instructions Manual

Deluxe 4---way multipoise fixed ---capacity condensing gas furnace sizes 040---120, series 100
Hide thumbs Also See for 58MEB:
Table of Contents

Advertisement

FURNAC
E
CASING
WIDTH
Downflow Applications on Non-Combustible Flooring
Downflow Applications on Combustible Flooring Using KGASB Subbase
17-1/2
Furnace with or without CAP , CAR, CNPV, CNRV Coil Assembly or KCAKC
(445)
Downflow Applications on Combustible Flooring NOT Using KGASB
Subbase Furnace with CAP , CAR, CNPV, CNRV Coil Assembly or KCAKC Coil
Downflow Applications on Non-Combustible Flooring
Downflow Applications on Combustible Flooring Using KGASB Subbase
21
Furnace with or without CAP , CAR, CNPV, CNRV Coil Assembly or KCAKC
(533)
Downflow Applications on Combustible Flooring NOT Using KGASB
Subbase Furnace with CAP , CAR, CNPV, CNRV Coil Assembly or KCAKC Coil
Downflow Applications on Non-Combustible Flooring
Downflow Applications on Combustible Flooring Using KGASB Subbase
24-1/2
Furnace with or without CAP , CAR, CNPV, CNRV Coil Assembly or KCAKC
(622)
Downflow Applications on Combustible Flooring NOT Using KGASB
Subbase Furnace with CAP , CAR, CNPV, CNRV Coil Assembly or KCAKC Coil
PERFORATED
DISCHARGE DUCT
FLANGE
Fig. 24 - - Duct Flanges
Step 4—Air Ducts
GENERAL REQUIREMENTS
The duct system should be designed and sized according to
accepted national standards such as those published by: Air
Conditioning Contractors Association (ACCA), Sheet Metal and
Air Conditioning Contractors National Association (SMACNA)
or American Society of Heating, Refrigerating and Air
Conditioning Engineers (ASHRAE) or consult The Air Systems
Design Guidelines reference tables available from your local
distributor. The duct system should be sized to handle the
required system design CFM at the design static pressure.
When a furnace is installed so that the supply ducts carry air
circulated by the furnace to areas outside the space containing the
furnace, the return air shall also be handled by a duct(s) sealed to
the furnace casing and terminating outside the space containing
the furnace.
Table 3 – Opening Dimensions --- In. (mm)
APPLICATION
Upflow Applications
Coil Box
Box
Upflow Applications
Coil Box
Box
Upflow Applications
Coil Box
Box
NO
YES
210 DEG.
MIN
YES
A93029
PLENUM OPENING
A
16 (406)
24-1/8 (613)
15-7/8 (403)
15-1/8 (384)
15-1/2 (394)
19-1/2 (495)
24-1/8 (613)
19-3/8 (492)
18-5/8 (473)
19 (483)
23 (584)
24-1/8 (613)
22-7/8 (581)
22-1/8 (562)
22-1/2 (572)
Secure ductwork with proper fasteners for type of ductwork used.
Seal supply-and return-duct connections to furnace with code
approved tape or duct sealer.
Flexible connections should be used between ductwork and
furnace to prevent transmission of vibration. Ductwork passing
through unconditioned space should be insulated to enhance
system performance. When air conditioning is used, a vapor
barrier is recommended.
Maintain a 1-in.(25 mm) clearance from combustible materials to
supply air ductwork for a distance of 36-in. (914 mm)
horizontally from the furnace. See NFPA 90B or local code for
further requirements.
For a furnace not equipped with a cooling coil, the outlet duct
shall be provided with a removable access panel. This opening
shall be accessible when the furnace is installed and shall be of
such a size that the heat exchanger can be viewed for possible
openings using light assistance or a probe can be inserted for
sampling
the
air
stream.
prevent leaks.
DUCTWORK ACOUSTICAL TREATMENT
Metal duct systems that do not have a 90 degree elbow and 10 ft
(3.0 M) of main duct to the first branch take-off may require
internal acoustical lining. As an alternative, fibrous ductwork
may be used if constructed and installed in accordance with the
latest edition of SMACNA construction 18 standard on fibrous
glass ducts. Both acoustical lining and fibrous ductwork shall
comply with NFPA 90B as tested by UL Standard 181 for Class 1
Rigid air ducts.
SUPPLY AIR CONNECTIONS
Upflow Furnaces
Connect supply-air duct to 3/4-in. (19 mm) flange on furnace
supply-air outlet. The supply-air duct attachment must be
connected to ONLY furnace supply-/outlet-air duct flanges or air
conditioning coil casing (when used). DO NOT cut main furnace
casing to attach supply side air duct, humidifier, or other
accessories. All accessories MUST be connected external to
furnace main casing.
- - 23 - -
FLOOR OPENING
B
C
16-5/8 (422)
24-3/4 (629)
19 (483)
16-1/2 (419)
19-5/8 (498)
19 (483)
16-3/4 (425)
20-3/8 (518)
19 (483)
16-1/2 (419)
20 (508)
20-1/8 (511)
24-3/4 (629)
19 (483)
20 (508)
19-5/8 (498)
19 (483)
20-1/4 (514)
20-3/8 (518)
19 (483)
20 (508)
20 (508)
23-5/8 (600)
24-3/4 (629)
19 (483)
23-1/2 (597)
19-5/8 (498)
19 (483)
23-3/4 (603)
20-3/8 (518)
19 (483)
23-1/2 (597)
20 (508)
The
cover
attachment
D
shall

Advertisement

Table of Contents
loading

Table of Contents