Checklist - Carrier 58MEB Installation, Start-Up, And Operating Instructions Manual

Deluxe 4---way multipoise fixed ---capacity condensing gas furnace sizes 040---120, series 100
Hide thumbs Also See for 58MEB:
Table of Contents

Advertisement

CHECKLIST—DIRECT VENT (2-PIPE) INSTALLATION
LOAD CALCULATION
__________
Heating Load (Btuh)
__________
Cooling Load (Btuh)
__________
Furnace Model Selection
COMBUSTION AIR AND VENT PIPING
Termination Location
__________
Roof or Sidewall
__________
Termination Kit — 2 Pipe or Concentric
__________
Combustion-Air Pipe Length
__________
Combustion-Air Pipe Elbow Quantity
__________
Vent Pipe Length
__________
Vent Pipe Elbow Quantity
__________
Pipe Diameter Determined from Sizing Table
__________
Pipe Sloped To Furnace
Pipe Insulation
__________
Over Ceilings
__________
Low-Ambient Exposed Pipes
Condensate Drain
__________
Unit Level or Pitched Forward
__________
Internal Tubing Connections Free
of Kinks and Traps
__________
External Drain Connection Leak Tight and sloped
__________
Condensate Trap Primed before Start-Up
__________
Heat Tape Installed if Required
CHECKLIST—START-UP
__________
Gas Input Rate
(Set Within 2 percent of Rating Plate)
__________
Temperature Rise Adjusted
Thermostat Anticipator
__________
Anticipator Setting Adjusted or
__________
Cycle Rate (3 Cycles per Hr) Selected
Safety Controls Check Operation
__________
Primary Limit
__________
Pressure Switch