For installing and
connecting a new
electronic control
board, the service techni-
cian must be earthed with
a grounding band.
96
R E P A I R S
Assembly checkpoints
•
The left and right button prints (42) are marked with "L" or "R" for easy identification.
•
After assembly check the plug arrangement of the mainboard (see "Wiring
diagrams" on page 97 and following).
•
Lay connection wires to button prints in brackets and cable guides like shown.
Citiz service manual
12
42