Napoleon GD36NTR Installation And Operation Instructions Manual page 20

Table of Contents

Advertisement

20
1. Fasten the roof support to the roof using the screws
provided. The roof support is optional. In this case the
venting is to be adequately supported using either
an alternate method suitable to the authority having
jurisdiction or the optional roof support. Figure 34.
2. Stretch the 4" fl exible vent pipe to the required
length. Slip the 4" fl exible vent pipe a minimum of 2"
over the inner pipe of the air terminal connector and
secure with 3 #8 screws. Seal using a heavy bead of
high temperature sealant W573-0007 (not supplied).
Figure 35.
NOTE: If using pipe clamps to connect vent components, 3 screws must also be
used to ensure the connection cannot slip off.
3. Repeat using the 7" fl exible vent pipe, using a heavy bead of high temperature sealant
W573-0002 (not supplied). Figure 35.
4. Thread the air terminal connector / vent pipe assembly down through the roof. The air terminal must be located vertically
and plumb. Attach the air terminal connector to the roof support, ensuring that the top of the air terminal is 16" above the
highest point that it penetrates the roof. Figure 34. DO NOT CLAMP THE FLEXIBLE VENT PIPE.
5. Remove nails from the shingles, above and to the sides of the chimney. Place the fl ashing over the air terminal connector
leaving a min. 3/4" of the air terminal connector showing above the top of the fl ashing. Slide the fl ashing underneath the sides
and upper edge of the shingles. Ensure that the air terminal connector is properly
centred within the fl ashing, giving a 3/4" margin all around. Fasten to the roof. Do
not nail through the lower portion of the fl ashing. Make weather-tight by sealing
with caulking. Where possible, cover the sides and top edges of the fl ashing with
roofi ng material. Figure 36.
6. Aligning the seams of the terminal and air terminal connector, place the terminal
over the air terminal connector making sure the vent pipe goes into the hole in the
terminal. Secure with the three screws provided. Figure 36.
7. Apply a heavy bead of weatherproof caulking 2" above the fl ashing. Note:
Maintain a minimum 2" space between the air inlet base and the storm collar. Install
the storm collar around the air terminal and slide down to the caulking. Tighten to
ensure that a weather-tight seal between the air terminal and the collar is achieved.
Figure 36.
8. If more vent pipe needs to be used to reach the fi replace, couple them together
as illustrated. The vent system must be supported approximately every 3 feet for
both vertical and horizontal runs. Use noncombustible strapping to maintain the
minimum 1" clearance to combustibles. Figure 33.
1. Install the 4" fl exible vent pipe to the fi replace. Secure with 3 screws and fl at washers. Seal
the joint and screw holes using the high temperature sealant W573-0007 (not supplied).
2. Install the 7" fl exible vent pipe to the fi replace. Attach and seal the joints using the high
temperature sealant W573-0002 (not supplied).
USING RIGID VENT COMPONENTS
The vent system must be supported approximately every 3 feet
for both vertical and horizontal runs. Use Napoleon® support
ring assembly W010-0370 or equivalent noncombustible
strapping to maintain the minimum clearance to combustibles
for both vertical and horizontal runs.
W415-0210 / R / 02.27.08
NorthlineExpress.com
VERTICAL AIR TERMINAL INSTALLATION
FIREPLACE VENT CONNECTION
http://www.northlineexpress.com
FIGURE 34
ROOF SUPPORT
2"
FIGURE 37
#10x2"
1"OVERLAP
SCREWS
CAULKING
7"RIGID
VENT
PIPE
INNER
PIPE
FIGURE 35
AIR
TERMINAL
CONNECTOR
HIGH
TEMPERATURE
SEALANT
4" FLEXIBLE
VENT PIPE
7" FLEXIBLE
VENT PIPE
FIGURE 36
AIR INLET
BASE
CAULKING
STORM
COLLAR
WEATHER
SEALANT
FLASHING
#8 X 1/2"
SELF
DRILLING
SCREWS
2" OVERLAP
HIGH TEMPERATURE
SEALANT
HI-TEMP
SEALANT
4"RIGID
VENT
PIPE
#8x1/2"
SELF DRILLING
SCREWS
FIGURE 38
Toll-Free 1-866-667-8454

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bgd36ntrBgd36ptrGd36ptr

Table of Contents