Pre-Installation Steps; Typical Installation Sequence; Detailed Installation Steps: Step 1. Framing - Superior DRT63STYN Installation Instructions Manual

Signature series see-through power vent dv gas fireplaces
Table of Contents

Advertisement

INNOVATIVE HEARTH PRODUCTS • SEE-THROUGH POWER VENT DV GAS FIREPLACES (DRT63STYN) • INSTALLATION INSTRUCTIONS

PRE-INSTALLATION STEPS

The appliance is shipped with all gas controls
and components installed and pre-wired.
1. Remove the shipping carton, exposing the
glass door on the control side.
2. Remove glass door assembly (see detailed
instructions on Page 27).
WARNING
Failure to position the parts in
accordance with these diagrams
or failure to use only parts specifi-
cally approved with this appliance
may result in property damage or
personal injury.
AVERTISSEMENT
Risque de dommages ou de
blessures si les pièces ne sont
pas installées conformément à
ces schémas et ou si des pièces
autres que celles spécifiquement
approuvées avec cet appareil sont
utilisées.
10
TYPICAL INSTALLATION
SEQUENCE
The typical sequence of installation is outlined
below.
Note: Each installation is unique and
may result in variations to the steps
described herein.
See the page numbers referenced in the fol-
lowing steps for detailed procedures.
Step 1. FRAMING (Page 10): Construct
appliance framing. Position
appliance within framing, and
secure with nailing brackets.
Step 2. ROUTE GAS LINE (Page 13):
Route gas supply line to right side
(when viewed from control side of
appliance).
Step 3. INSTALL VENT SYSTEM (Page 13):
install vent system and exterior
termination.
Step 4. FIELD WIRING (Page 20): Connect
120 Vac electrical power to the
appliance receptacle.
Step 5. REMOVE GLASS DOOR ASSEMBLY
(Page 22).
Step 6. CONNECT GAS LINE (Page 23):
Make connection to gas supply.
Step 7. INSTALL FIREBOX LINER PANELS
(Page 23).
Step 8. VERIFY APPLIANCE OPERATION
(Page 23).
Step 9. INSTALL VOLCANIC STONE,
GLOWING EMBERS, AND LOGS
(Page 24).
Step 10. INSTALL GLASS DOORS, MESh
PULL SCREENS, AND MODESTY
PANEL (Page 27).
Step 11. BURNER ADJUSTMENTS (Page
28): Adjust burner air shutter to
ensure proper flame appearance.
FINIShING REQUIREMENTS (Page 29).
Step 12. ATTACh SAFETY-IN-OPERATION
WARNINGS (Page 31).
NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.
DETAILED INSTALLATION STEPS
Step 1. FRAMING
Frame these appliances as illustrated on Page 11.
All framing details must allow for a minimum
clearance to combustible framing members as
shown on Page 9.
If the appliance is to be elevated above floor
level, a solid continuous platform must be
constructed below the appliance.
Headers may be in direct contact with the
appliance top spacers, but must not be sup-
ported by them or notched to fit around them.
All construction above the appliance must be
self-supporting; DO NOT use the appliance for
structural support.
Secure the fireplace to the side framing members
using the unit's nailing flanges — one top and
bottom on each side of the fireplace front (see
Figure 10). Use 8d nails or their equivalent.
Securing Unit to Framing
by Nailing Flanges
Use Top Flange for
1/2" Thick Drywall
Front of Fireplace
Use Center Flange
for Flush Mount
Use Bottom Flange for
5/8" Thick Drywall
Left Side Front Corner of Fireplace Shown
(Same requirements for right side)
Note: The nailing flanges, combustible
members and screw heads in areas directly
adjacent to the nailing flanges are EXEMPT
from the 1/2-inch clearance to combustible
requirements for the firebox outer wrapper.
Combustible framing may be in direct
contact with the nailing flanges and may
be located closer than 1/2 inch from screw
heads and the firebox wrapper in areas
adjacent to the nailing flanges. Frame the
opening to the exact dimensions specified
in the framing details of the Installation
Instructions.
Figure 10