Commissioning the heating system
▶ Carefully refit and tighten blanking plug in testing point for gas supply
dynamic pressure on the gas valve inlet flange.
1
2
Fig. 49 Measuring gas supply pressure
[1]
Pressure testing nipple for testing gas supply dynamic pressure
and purging Gas valve: Honeywell V4730C
[2]
Blanking plug
▶ Turn on the gas isolating valve on the back of the boiler.
Gas type
Natural gas (gas type A)
3.5" W.C.
Table 16
1) The gas company must guarantee the min. and max. pressures (as per national
regulations for public gas supply).

7.17 Checking for leaks during operation

▶ With the burner running, use a foaming leak detecting agent to test all
joints along the entire burner gas supply route, e.g.:
• Blanking plug in testing point for gas supply dynamic pressure
• Unions, etc.
The agent must be approved for gas leak testing.
CAUTION: Risk of system damage due to short-circuits.
▶ Before testing for leaks, cover the areas at risk, e.g.
the internal water pressure sensor and the return
sensor on the boiler return.
▶ Do not spray leak detector onto cable entries, plugs or
electrical connecting leads. Do not let it drip onto
them either.
▶ To avoid corrosion, carefully wipe off the leak
detector afterwards.
38
7 747 010 720-56.1RS
1)
Supply pressure
Min
Rated
Max
7.0" W.C.
10.5" W.C.

7.18 Installing outer casing panels

If the boiler side panels/front panel will not fit properly,
level the boiler ( Section 6.12.2, page 31).
▶ Slot the bottom of the side panels into position first, then raise slightly
and slot in at the top.
▶ Secure the side panels at the front and back of the boiler using the
securing screws.
▶ Slot the bottom of the front panel into position first, then raise slightly
and slot in at the top.
▶ Secure the front panel at the top of the boiler using the securing
screw.
▶ Attach the clear wallet containing the technical documentation in a
visible position on the boiler side panel.
1.
Fig. 50 Installing outer casing panels
[1]
Side panel
[2]
Front cover
[3]
Screw
7.19 Informing the owner/operator and handing over
technical documentation
Familiarize the owner/operator with the entire heating system and the
operating instructions for the boiler.
Shut down and restart the system together with the owner/operator.
With the aid of the operating instructions, explain to the customer what
to do in an emergency, e.g. a fire.
Hand over the technical documentation to the owner/operator and then
both sign the commissioning log ( Section 7.20, page 39).