14.2 Inspection report

 Please indicate the inspection activities that you have
carried out and enter the values measured.
Inspection activities
1. Test the general condition of the heating system
2. Carry out a visual inspection and test the functions of the
heating system
3. Test all gas and water conduits and fittings for:
– their tightness during operation
– visible corrosion
– signs of aging
– fill the condensate trap
4. Check the burner, the heat exchanger and the condensate trap for
pollution. First shut down the heating system
5. Check the burner and the ignition and ionization electrodes.
First shut down the heating system
6. Measure the ionization current
7. Measure the gas connection pressure (flow pressure)
8. Check the gas/air ratio
9. Carry out a gas tightness test in operating conditions
10. Measure the carbon monoxide content (CO)
11. Check the water pressure of the heating system
– Inlet pressure of expansion tank (also see the
Installation Instructions for the expansion tank)
– Filling pressure
12. Check the operation and safety of the air intake and flue pipe
13. Check that the thermostat is set in line with the needs
(see documents with thermostat)
14. Final check of inspection activities, note down the measurement
and test results
15. Confirm proper inspection
Logamax plus GB142-24/30/45/60 - We reserve the right to make any changes due to technical modifications!
page Date: ______
Date: ______
48
47
32
49
49
37
_______ µA
_______ µA
33
_______ psi
_______ psi
34
_____ inch W.C. _____ inch W.C. _____ inch W.C.
48
48
_______ ppm
_______ ppm
30
_______
_______ psi
30
_______ psi
32
39
Company stamp/
Company stamp/
signature
Reports
14
Date: ______
_______ µA
_______ psi
_______ ppm
Company stamp/
signature