Inspection Report; Maintenance Report - Buderus Logamax plus GB142-24 Installation Instructions Manual

Condensing
Hide thumbs Also See for Logamax plus GB142-24:
Table of Contents

Advertisement

14.2

Inspection report

▶ Please indicate the inspection activities that you have carried out and enter the values measured.
Inspection activities
1. Test the general condition of the heating system
2. Carry out a visual inspection and test the functions of the heating system
3. Test all gas and water conduits and fittings for:
• their tightness during operation
• visible corrosion
• signs of aging
• fill the condensate trap
4. Check the burner, the heat exchanger and the condensate trap for pollution.
First shut down the heating system
5. Check the burner and the ignition and ionization electrodes.
First shut down the heating system
6. Measure the ionization current
7. Measure the gas connection pressure (flow pressure)
8. Check the gas/air ratio
9. Carry out a gas tightness test in operating conditions
10. Measure the carbon monoxide content (CO)
11. Check the water pressure of the heating system
• Inlet pressure of expansion tank (also see the Installation Instructions for
the expansion tank)
• Filling pressure.
12. Check the operation and safety of the air intake and flue pipe
13. Check that the thermostat is set in line with the needs (see documents with
thermostat)
14. Final check of inspection activities, note down the measurement and test
results
15. Confirm proper inspection
Table 17
14.3

Maintenance report

▶ Sign for the maintenance activities that you have carried out and enter the date.
Needs-dependent maintenance activities
1. Clean the burner, the heat exchanger and the condensate trap. First shut down the
heating system
2. Check and adjust the gas/air ratio
CO
content with full load
2
CO
content with partial load
2
Confirm proper maintenance
Table 18
Logamax plus GB142-24/30/45/60 – 6720820104 (2017/05)
Page
Date: __________
Date: __________
29
29
22
29
29
24
____________ mA ____________ mA ____________ mA
23
____________ psi ____________ psi ____________ psi
23
______ inch W.C. ______ inch W.C. ______ inch W.C.
29
29
____________ %
____________ %
____________ psi
____________ psi
____________ psi
____________ psi
22
25
Company stamp/
Company stamp/
signature
signature
Page
Date: __________
29
23
_____________ inch W.C.
_____________ %
_____________ %
Company stamp/
signature
14
Reports
Date: __________
____________ %
____________ psi
____________ psi
Company stamp/
signature
Date: __________
_____________ inch W.C.
_____________ %
_____________ %
Company stamp/
signature
35

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents