Vitocell 300-V Installation Instructions
120 USG (450 Liter) Tank Installation
Fitting the thermometer and thermometer sensor
(if supplied) and covers
1. Smooth out the insulation jacket by tapping the jacket
evenly against the tank.
2. Route thermometer capillary tube through the
front cover hole and insulation jacket, then snap the
thermometer in place.
3. Insert the thermometer probe under the clip.
4. Install the front cleanout cover and the front lower
seam cover.
5. Install the upper front seam cover.
(continued)
6. Install the back seam cover.
7. Insert the thermometer sensor into the tank cap hole
as far as it will go.
8. Secure the sensor with a spring clip.
9. Install the top insulation and press down the edges
as shown.
10.Install the top lid and press the logo A into the lid.
Note: Seal the hole in the seam cover below the
thermometer with a cover.
Set-up and Connections
13