Biasi Riva Plus Installation And Operation Instructions Manual page 26

Wall hung gas boiler for central heating supply
Table of Contents

Advertisement

9. Venting Cont.
F
Standard Vertical-roof kit (Exhaust & intake outside)
This kit allows vertical termination of the flue pipe through the roof. The kit is 1.2 min length.
Extension pieces (Co--axial) are also available which allows the flue system to be extended
to a total overall maximum permissible length.
Optional 45° and 90° elbows can be used to offset the flue route.
Each additional elbow reduces the overall acceptable length of the flue system as follows:
45° reduce length by 1.6 ft.
90° reduce length by 3.2 ft.
Installation:
Drill hole through the outside roof.
Cut the pipe as necessary.
Slide the intake and exhaust pipes through the hole.
Slide one rubber wall trim piece on the pipe from inside and one from outside.
Connect exhaust (inner) pipe to concentric elbow.
Connect intake (outer) pipe to concentric elbow.
Secure elbow to boiler using gasket and four screws provided.
Secure end cap on the intake pipe outside the house.
26
Riva Plus Manual
Figure 9.8 (vertical pipe Φ 3.1 / Φ 4.9 in)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents