Clearances From Boiler - Rinnai E75CN Installation & Servicing Instructions Manual

High efficiency condensing gas boiler
Table of Contents

Advertisement

Available languages

Available languages

5.3.2
service clearances to the boiler
Top of boiler
Back of boiler
Front of boiler
Left side of boiler
Right side of boiler
Floor / Ground
Vent
clearances to the boiler
For closet installation: clearance is 1" / 25mm from the front.
Low Loss Header
Clearances to combustible and non-Combustible is 0 inch for sides, top, front and floor/ground
16

Clearances from boiler

ceiling
Min. 10" /
250mm
15.7"
24"
400
600
Minimum required clearances
to combustibles
All types
inch / mm
2" / 50
0"
6" / 150
2" / 50
2" / 50
12" / 300
0"
2"
50
Minimum required clearances
to non-combustibles
All types
inch / mm
2" / 50
0"
6" / 150
2" / 50
2" / 50
12" / 300
0"
2"
50
figure 4
Recommended
service clearances
All types
inch / mm
10" / 250
0
24" / 600
2" / 50
2" / 50
30" / 762
0"
table 3

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

E110cnE75cpE110cp

Table of Contents