Relevant Installation, Service And User Manuals; Disposal; Regulations And Guidelines - Rinnai E75CN Installation & Servicing Instructions Manual

High efficiency condensing gas boiler
Table of Contents

Advertisement

Available languages

Available languages

1.7 Relevant Installation, Service and User manuals

– Vent system
– Rinnai Boiler Applications Manual

1.8 Disposal

– Dispose of the boiler packaging in an environmentally sound manner.
– Dispose of components of the heating system (e.g. boiler or control device), that
2

Regulations and guidelines

The installation must comply to the requirements of the authority having jurisdiction
or, in the absence of such requirements, to the latest edition of the National Fuel Gas
Code, ANSI Z223.1/NFPA 54. In Canada, installation must be in accordance with
the requirements of CAN/CSA B149.1, Natural Gas and Propane Installation Code.
Where required by the authority having jurisdiction, the installation must comply to
the Standard for Controls and Safety Devices for Automatically Fired Boilers, ANSI/
ASME CSD-1.
Install CO detectors per local regulations. Boiler requires an inspection every 2 years
and maintenance every 4 years or 4000 hours. See maintenance section chapter 13.
Operating Limits of the boiler:
The hot water distribution system must comply with all applicable codes and
regulations. When replacing an existing boiler, it is important to check the condition
of the entire hot water distribution system to ensure safe operation.
must be replaced in an environmentally responsible manner.
Max. boiler temperature: 176 °F (80.0 °C)
Max. operating pressure: 45 psi (3 bar)
Max Allowable Working Temperature ASME: 200 °F (93 °C)
Max. Allowable Working Pressure ASME: 45 psi (3 bar)
7

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

E110cnE75cpE110cp

Table of Contents