Ocv (Oil Control Valve) - Suzuki DF200 Service Manual

Outboard motors four stroke v6
Hide thumbs Also See for DF200:
Table of Contents

Advertisement

3-70
ENGINE CONTROL SYSTEM
INSTALLATION
Installation is reverse order of removal with special attention to
the following steps.
• Before installing oil pressure switch, wrap screw threads with
sealing tape then tighten switch to specified torque.
NOTE:
Cut off any excess sealing tape from switch threads before
installation.
+ Oil pressure switch: 13 N·m (1.3 kg-m, 9.5 lb-ft)
• Start engine and check oil pressure switch for oil leakage.
Reseal switch if oil leakage is found.

OCV (Oil control valve)

REMOVAL
1. Remove collector assembly. (See page 6-3, 6-6.)
2. Disconnect OCV lead wire connector at OCV.
3. Remove the four (4) bolts securing OCV, then remove OCV
and discard OCV gasket.
INSTALLATION
Installation is reverse order of removal with special attention to
the following steps.
• Install gasket and OCV, then tighten bolts securely.
NOTE:
Position the projection of OCV gasket as shown the right.
!
Do not re-use the OCV gasket, always replace with
new one.
+ OCV bolt: 12 N·m (1.2 kg-m, 8.6 lb-ft)
• Install collector assembly.
Refer to "Collector assembly" in this section for assembly.
• Check to ensure that all removed parts are back in original
position.
1
1. Sealing tape
1
1. OCV
1
1. OCV gasket

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Df225Df250

Table of Contents