Maintenance; Maintenance Schedule - Husqvarna PR 17 Operator's Manual

Hide thumbs Also See for PR 17:
Table of Contents

Advertisement

Maintenance schedule

The following is a list of the maintenance which should be conducted on the machine. For those points not described in this manual,
visit an authorised service workshop.

Maintenance

Cleaning
Check the engine's oil level
Check the engine's cooling air intake
Check the fuel pump air filter
Check the steering wires
Check the level of the battery acid
Check the safety system
Check nuts and screws
Check for fuel and oil leakage
Clean around the silencer
Start engine and blades, listen for noise
Clean transmission air intake
1)
Change engine oil
Check the cutting deck
Checking the blades
Clean underside of cutting unit
Check the air pressure in the tyres, 60 kPa/8.5 PSI.
Lubricate belt tensioner (nipple)
Lubricate the driver's seat
Lubricate all wires
Lubricate bearing surfaces on cutting unit
Clean inside frame tunnel
Lubricate the pedal system in the frame tunnel
Lubricate the hydrostatic cable with links
Check the parking brake
Lubricate the parking brake wire
Lubricate throttle control
Lubricate choke control
Lubricate the chain in the frame tunnel
Check steering chain inside frame tunnel
Check for damage to wire guide at articulated joint
Clean thoroughly around engine
Clean thoroughly around transmission
Check the V-belts
Check the cooling fins on the hydrostatic transmission
22 –
English
Maintenance
Daily
maintenance
before starting
X
X
X
X
X
X
X
O
O
O
O
X
X
X
X
X
At least
Weekly
once a
3)
maintenance
year
X
X
X
X
X
X
X
X
X
X
X
X
X
O
X
X
X
Maintenance
interval in hours
25
50
100 250
X
1)
1)
X
X
X
X
X
O
X

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents