Finishing; Mantel Projections - Heat & Glo SL-550BE Owner's Manual

Table of Contents

Advertisement

11 11

Finishing

A. Mantel Projections
Figure 11.1 shows the minimum vertical and correspond-
ing maximum horizontal dimensions of appliance mantels
or other combustible projections above the top front edge
of the appliance.
All measurements
are in inches
6
5
4
3
TOP OF HOOD OR FIREPLACE OPENING
Figure 11.1 Clearances to mantels or other combustibles
above appliance
3-1/2 in.
1/2 in.
NON-COMBUSTIBLE ZONE
Figure 11.2 Non-Combustible Zone
44
CEILING
12
11
10
9
8
7
13
12
11
10
9
8
7
6
5
4
1/2 in. SHEETROCK
OR COMBUSTIBLE
MATERIAL
Heat & Glo • SL-550BE, SL-550BE-IPI • 2114-900 Rev. H • 2/08
Note: Clearance from
opening to perpendicular wall.
Figure 11.3 Clearances to Mantel Legs or Wall Projections
32
Note: Clearance from
opening to perpendicular wall.
Figure 11.4 Wall Projection (Acceptable on one side of opening)
2-7/8 IN.
MINIMUM
(Acceptable on both sides of opening.)
5-3/8 IN.
MINIMUM
1/2 IN.
MINIMUM
3 FT. MAXIMUM
3 IN.
MINIMUM
UNLIMITED

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl-550be-ipi

Table of Contents