Heat & Glo SL-550TRSI-AUE Installation And Operation Instructions Manual page 21

Natural gas or propane as a balanced flue heater
Hide thumbs Also See for SL-550TRSI-AUE:
Table of Contents

Advertisement

For Vertical Runs
The fl ue system must be supported every 2.4 M above
the heater fl ue outlet by wall brackets.
To install support brackets for vertical runs:
• Attach wall brackets to the fl ue pipe and secure the
wall bracket to the framing members with nails or
screws.
FLUE
OUTLET
25 mm
Figure 35. Installing Support Brackets
4. Install Firestops
For Horizontal Runs - Firestops are REQUIRED on
both sides of a combustible wall through which the
fl ue passes.
Frame a hole in a combustible wall for an interior wall
shield fi restop, whenever a wall is penetrated. Use
same size framing materials as those used in the wall
construction. The wall shield fi restop maintains mini-
mum clearances and prevents cold air infi ltration. a
wall shied fi restop must be placed on each side of an
interior wall. A minimum 38 mm overlap of attached
heat shield must be maintained. See Figure 35.
Non-Combustible Wall Penetration
If the hole being penetrated is surrounded by non-
combustible materials such as concrete, a hole with
diameter 25.4 mm greater than the pipe is acceptable.
Whenever a non-combustible wall is penetrated, the
wall shield fi restop is only required on one side and no
heat shield is necessary.
WALL BRACKET
WALL STUD
2.4m
Heat & Glo • SL-550TRSI-AUE • 2079-902 Rev. K • 10/08
For Vertical Runs - One fi restop is REQUIRED at the
hole in each ceiling through which the fl ue passes.
To install fi restops for vertical runs that pass through
ceilings:
• Position a plumb bob directly over the center of the
vertical fl ue component.
• Mark the ceiling to establish the centerpoint of the
fl ue.
• Drill a hole or drive a nail through this center
point.
• Check the fl oor above for any obstructions, such
as wiring or plumbing runs.
• Reposition the heater and fl ue system, if necessary,
to accommodate the ceiling joists and/or obstruc-
tions.
• Cut a 254 mm X 254 mm hole through the ceiling
when using DVP pipe, and a 229 mm x 229 mm
hole when using SLP pipe. Use the fi restop pipe
opening as a guide.
• Frame the hole with framing lumber the same size
as the ceiling joists.
A
NEW
FRAMING
MEMBERS
CEILING
A
SLP
229 mm
DVP
254 mm
Figure 36. Hole and New Framing Members
B
CHIMNEY
HOLE
EXISTING CEILING
JOISTS
B
229 mm
254 mm
21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl-350trsi-aue

Table of Contents