Installing The Standoffs - Montigo H34D Installation Operation & Maintenance

Gas fireplace
Hide thumbs Also See for H34D:
Table of Contents

Advertisement

Installing Terminations with Built-In Frames
11
11
1.
Frame the termination opening to 11" x 11".
2.
Fasten the termination to the studs using a minimum of 4 screws.
Installing Terminations with MSR Frames
12
12
1. Frame the termination opening to 12" x 12".
2. Fasten the termination to the studs using a minimum of 4 screws.
Installing Terminations with MOSR Frames
MOSR
MTO-3
1.
Frame the termination opening to 12" x 12".
2.
Fasten the MOSR frame to the interior side of the studs using a
minimum of 4 screws.
3.
Insert the termination into the MOSR frame as shown here, and
attach by screwing through the four pilot holes in the termination.
Part No. XG0130
Installation
Installing Heat Guards over Terminations
MTO-3F
1.
2.
MSR
MTO-3
Figure 6b. Installing the standoff's.
12 12
12
Ensure that the two long mounting brackets are facing the bottom of
the termination. (See inset). This will provide more heat protection
at the top of the termination, where temperatures are highest.
Attach to the faceplate of the termination using four sheet metal screws.

Installing The Standoffs

To avoid elevated mantel temperatures, all H38DF gas fireplaces
are required to have the supplied standoffs installed.
The fireplace is supplied with two standoffs. Bend and install these
standoffs on top of the fireplace ensuring that the height of the standoff
maintains a 6" clearance.
H34D Gas Fireplace
MTKOG
Page 5