Bryant 311AAV Series 100 Installation, Start-Up, And Operating Instructions Manual page 27

Single-stage induced combustion deluxe 4-way multipoise furnace
Table of Contents

Advertisement

____________
____________
____________
AIR FOR COMBUSTION AND VENTILATION
____________
____________
____________
____________
____________
____________
____________
____________
____________
____________
____________
____________
CHECK SAFETY CONTROLS OPERATION
____________
____________
____________
CHECKLIST—INSTALLATION
LOAD CALCULATION
Heating Load (Btuh)
Cooling Load (Btuh)
Furnace Model Selection
Unconfined Space
Confined Space
VENTING
NFGC (United States)
NSCNGPIC (Canada)
Local Codes
1/4-in. Upward Slope
Joints Secure
See Attached Vent Table Instructions
CHECKLIST—START-UP
Gas Input Rate
(Set Within 2 percent of Rating Plate)
Temperature Rise Adjusted
Thermostat Anticipator Setting Adjusted or
Thermostat Cycle Rate (3 cycles per Hr)
Primary Limit
Pressure Switches
Draft Safeguard Switch
—27—

Advertisement

Table of Contents
loading

Table of Contents