Bryant 311AAV Series 100 Installation, Start-Up, And Operating Instructions Manual page 10

Single-stage induced combustion deluxe 4-way multipoise furnace
Table of Contents

Advertisement

A
PLENUM
OPENING
B
FLOOR
OPENING
C
Fig. 11– Floor and Plenum Opening Dimensions
FURNACE
CD5 OR CK5
COIL ASSEMBLY
OR KCAKC
COIL BOX
COMBUSTIBLE
FLOORING
SHEET METAL
PLENUM
FLOOR
OPENING
Fig. 13–Furnace, Plenum, and Coil Assembly or Coil Box
Installed on a Combustible Floor
Install a sediment trap in riser leading to furnace. Trap can be
installed by connecting a tee to riser leading to furnace so
straight-through section of tee is vertical. Then connect a capped
nipple into lower end of tee. Capped nipple should extend below
level of gas controls. Place a ground joint union between gas
control manifold and manual gas shutoff valve. (See Fig. 18.)
Piping should be pressure tested in accordance with local and
national plumbing and gas codes before the furnace has been
attached. If the pressure exceeds 0.5 psig (14-in. wc), the gas
supply pipe must be disconnected from the furnace and capped
D
A96283
A96284
Fig. 12–Furnace, Plenum, and Subbase Installed on a Com-
before the pressure test. If the test pressure is equal to or less than
0.5 psig (14-in. wc), turn off electric shutoff switch located on the
gas valve before the test. It is recommended that the ground joint
union be loosened before pressure testing.
After all connections have been made, purge the lines and check
for gas leakage with regulated gas supply pressure.
—10—
FURNACE
(OR COIL CASING
WHEN USED)
COMBUSTIBLE
FLOORING
DOWNFLOW
SUBBASE
SHEET METAL
PLENUM
FLOOR
OPENING
bustible Floor
A96285

Advertisement

Table of Contents
loading

Table of Contents