Bu/Rb-B130D/B300D-5X-Gige; Installation Guidelines; Figure 2-10: Bu/Rb-B130D/B300D-5X-Gige Installation 1 - Alvarion BreezeNET B130 GigE Technical User's Manual

Table of Contents

Advertisement

Chapter 2 - Hardware Description
2.4

BU/RB-B130D/B300D-5X-GigE

2.4.1

Installation Guidelines

1
Unpack the equipment
Check items integrity
2
Prepare RF-cables of the required length. The recommended maximal RF cable
3
length is 1 meter.
Install and isolate the connectors on the RF cables
4
Determine the STP cable length that is used to connect IDU and ODU. The
5
total cable length between LAN (behind IDU) and ODU should not be longer
than 100 meters. Service cable connecting IDU and ODU should be STP Cat
5E cable.
Install (solder) connector for ODU on the STP cable and isolate it
6
If it is possible to lay STP cable with a connector on the IDU side, install
7
(solder) connector for IDU on the STP cable and isolate it
Lay the STP cable "from top to bottom" - from ODU to IDU
8
9
If step 7 is not accomplished, after the STP cable has been laid, install (solder)
connector for IDU
10
Install ODU on the mounting bracket connectors down and tighten it
Alvarion BreezeNET B130/B300 GigE

Figure 2-10: BU/RB-B130D/B300D-5X-GigE Installation 1

22

BU/RB-B130D/B300D-5X-GigE

Technical User Manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Breezenet b300 gigeBreezenet b300Bu/rb-b300d-5xBu/rb-b300-5x

Table of Contents