GE LP 33 Series Operating Manual page 27

60 – 80 – 100 – 120 kva 400 vac ce / series 2
Hide thumbs Also See for LP 33 Series:
Table of Contents

Advertisement

Opening for input and output cable connections LP 33 Series
44mm
Fig. 5.4-2 LP 33 Series 60 - 80 kVA – Opening on the bottom cabinet
LP 33 Series opening is provided on the bottom of the UPS for the connection of input and output
cables.
Pay attention to the position of this opening, when choosing the placement of the UPS.
Fixing of the UPS cabinet LP 33 Series on the floor
The UPS cabinet is free standing and normally
does not require to be bolted to the floor.
The UPS cabinet can be fixed however to the
floor by bolting it with the supporting blocks to
the floor.
Ø 10mm
32mm
Fig. 5.4-5 LP 33 Series 60 - 80 kVA – UPS cabinet floor fixing points
Modifications reserved
OPM_LPS_33E_60K_M12_2GB_V010.doc
512mm
44mm
26mm
45mm
536mm
32mm
44mm
Fig. 5.4-3 LP 33 Series 100 - 120 kVA - Opening on the bottom cabinet
Fig. 5.4-4 Fixing of the UPS cabinet on the floor
Ø 10mm
32mm
656mm
Fig. 5.4-6 LP 33 Series 100 - 120 kVA - UPS cabinet floor fixing points
Operating Manual LP 33 Series 60-80-100-120 kVA / S2
632mm
44mm
26mm
45mm
32mm
Page 27/103

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents