Factory With Adjoining Offices; Manufacturing Plant - Toshiba Strata AirLink Installation Manual

Digital business telephone systems
Hide thumbs Also See for Strata AirLink:
Table of Contents

Advertisement

Factory with Adjoining Offices

Both Base Stations are placed in the
factory area (see
accommodate the greater number of
users in that area.
Place Base Station 2 closer to the
offices, maximizing line of sight
signal through the doorway.
This is especially important if the
wall between the offices and factory
is concrete.
The Base Stations are also mounted
on the ceilings and away from any
potential obstructions to the
antennas.
If a second area was available to the
left of the factory, moving Base
Station 1 to that location would
broaden the coverage to users in that
area also.

Manufacturing Plant

The entrance from the manufacturing area into
the cafeteria is a high-traffic area.
Placing a Base Station (see
entry area of the cafeteria blocks the line of
sight to the other areas in the cafeteria.
Locate Base Station 2 centrally in the cafeteria
and Base Station 1 in the manufacturing area.
Align Base Station 2 with the entrance of the
cafeteria to provide coverage into that area.
Strata AirLink Installation Guide
Figure
10) to
168'
Figure 10
Figure
11) in the
5/00
Step 3: Review Possible System Configurations
320'
Factory Floor
(32 handset users)
200'
140'
Front
Door
System with a Factory and Adjoining Offices
Base Station 2
Cafeteria
Figure 11
System in a Manufacturing Area
Pre-installation
Base Station 1
(ceiling mounted)
Base Station 2
(wall mounted)
Offices
2976
Manufacturing Area
Base Station 1
Offices
2977