System Control Panel; Final Installation Considerations; Fuel Supply System - Briggs & Stratton Home Generator System Installation & Start-Up Manual

Home generator system
Hide thumbs Also See for Home Generator System:
Table of Contents

Advertisement

Available languages

Available languages

System Control Panel

The home generator control panel, located inside the
generator housing, is shown below.
C
B
A
Brief descriptions of the controls used during installation are:
A - Set Exercise Switch — Used to set the exercise cycle.
B - System Switch — Switches modes to OFF and AUTO.
C - 15 Amp Fuse — Protects the DC control circuits.
D - Digital Display — Displays running time and fault codes.
E - Circuit Breaker — Must be ON to supply power to the
transfer switch.
F - Manual Over-Ride Switch — Turns generator ON or OFF.
More information may be found in Controls in the Operator's
Manual.
System Switch
This two-position switch is the most important control on
the home generator and is used as follows:
• "AUTO" position is the normal operating position. If
a utility power outage is sensed, the system will start
the generator. When utility power is restored, lets the
engine stabilize internal temperatures, shuts off the
generator, and waits for the next utility power outage.
• "OFF" position turns off running generator, prevents
unit from starting and resets any detected faults.
15 Amp Fuse
Protects the home generator DC control circuits. If the fuse
has 'blown' (melted open) or was removed, the engine
cannot crank or start. Replace the fuse using only an
identical ATO 15A fuse. One spare fuse is supplied with the
unit. If fuse was blown or removed, you will need to reset
the exercise timer (see Setting Exercise Timer).
D
E
F

Final Installation Considerations

Engine Oil
NOTICE
Any attempt to crank or start the engine before it has been
properly serviced with the recommended oil will result in
equipment failure.
Refer to Maintenance and engine manual for oil fill
information.
Damage to equipment resulting from failure to follow this
instruction will void engine and generator warranty.
This engine is shipped from the factory pre-run and filled
with synthetic oil (API SJ/CF 5W-30W). This allows for
system operation in the widest range of temperature and
climate conditions. Before starting the engine, check oil level
and ensure that engine is serviced as described in the engine
operator's manual.
NOTE: The use of synthetic oil does not alter the required oil
change intervals described in the engine operator's manual.
Battery
The installer must supply and install a sealed, valve-
regulated, lead-acid rechargeable 12 Volt DC, AGM type,
starting battery with at least at least 600 CCA (cold cranking
amps.
NOTE: DO NOT use a deep-cycle or automotive type battery.
Install the battery as described in Servicing the Battery in the
Maintenance section of the operator's manual. Always make
sure the negative cable is hooked up last.
The battery may not be at full charge when installed. If
battery voltage is below 12 Volts, charge the battery. See
Battery in Maintenance of the operator's manual for details.

Fuel Supply System

Ensure that all fuel pipe connections are tight, secure and
without leaks.
Ensure that all gas line shutoff valves are OPEN and that
adequate fuel pressure is available whenever automatic
operation is desired.
15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

9kw12.5kw13.5kw

Table of Contents