First Aid Measures

Eye Contact - Flush eyes with water to remove dust. If symptoms persist, seek medical attention.
Skin Contact - Wash affected areas gently with soap and warm water after handling.
An optional roof curb, specifically designed for the Voyager commercial rooftop units is available
from Trane. The roof curb kit must be field assembled and installed according to the latest edition
of the curb installation guide.

Unit Inspection

As soon as the unit arrives at the job site:
If the job site inspection reveals damage or material shortages, file a claim with the carrier
immediately. Specify the type and extent of the damage on the "bill of lading" before signing. Do
not install a damaged unit without the Appropriate Trane sales representative's approval!
No Step Surface!
Do not walk on the sheet metal drain pan. Walking on the drain pan could cause the supporting
metal to collapse. Failure of the drain pan could result in death or serious injury.
Bridging between the unit's main supports may consist of multiple 2 by 12 boards or sheet metal
grating.

Storage

Take precautions to prevent condensate formation inside the unit electrical components and
motors when:
Isolate all side panel service entrances and base pan openings (e.g., conduit holes, S/A and R/A
openings, and flue openings) to minimize ambient air from entering the unit until it is ready for
startup.
Do not use the unit heater as temporary heat without completing the startup procedures detailed
under "Unit startup".
Trane will not assume responsibility for equipment damage resulting from accumulation of
condensate on the unit electrical components.
RT-SVX34C-EN
Verify that the nameplate data corresponds to the sales order and bill of lading (including
electrical data).
Visually inspect the exterior of the unit, including the roof, for physical signs of shipping
damage.
Check for material shortages.
placed inside the unit.
Visually check the internal components for shipping damage as soon as possible after delivery
and before it is stored. Do not walk on the sheet metal base pans.
WARNING
If concealed damage is discovered, notify the carrier's terminal office immediately by phone
and by mail. Concealed damage must be reported within 15 days.
Request an immediate joint inspection of the damage by the carrier and the consignee. Do not
remove the damaged material from the receiving location. Take photos of the damage, if
possible. The owner must provide reasonable evidence that the damage did not occur after
delivery.
a. The unit is stored before it is installed; or,
b. The unit is set on the roof curb and temporary auxiliary heat is provided in the building.
Figure 11 on page 23