Marquis ULTIMATE HOT TUB EXPERIENCE! Owner's Manual page 12

Table of Contents

Advertisement

120 Volt
120 Volt spas shall be plugged into a properly grounded, grounding type 15
amp receptacle on a dedicated circuit. A dedicated circuit is a circuit with no
other components that consume power, such as lights, televisions, radios,
computers, or other electronic devices. These could cause your spa to mal-
function by any of the following: unusual text on the control panel, slow heating,
poor jet action, tripping house breaker, or blown fuses. Failure to follow these
instructions could lead to premature failure of spa components that would not
be covered under the warranty. The dedicated circuit shall meet the following
specifications:
• Rated 120V, 60Hz, 15A (2 wires plus ground)
• Circuit breaker or fuse size: 15A
• The receptacle must be at least 5 feet (1.52 m) from the spa.
• The 15 foot GFCI power cord provided with the spa must be plugged
directly into the receptacle. Do nOT use an extension cord or any other
adaptor. Actual exposed length of cord will vary by model, but will never be
less than 12 feet.
Convert 120 Volt to 240 Volt
120 Volt spas may be converted to operate on 240V, 50A. Wiring must be per-
formed by a licensed electrician in accordance with the nEC and any local or
regional electric codes.
1. D isconnect the power: Unplug GFCI cord from wall receptacle. Disconnect
cord end from terminal block and ground bar inside equipment box.
2. Move white jumpers on J24 to connect the two middle pins only. Failure to
do this will result in a blown transformer.
3. For 50 amp operation Move dip switch #2 up to the on position. This will
allow the heater to operate on pump 1 high speed4. Install 240V power as
indicated on the 240V section.
4. Remove the jumper wire connecting J75 to J47 and discard.
5. R econnect the spa with 230v power to approved GFCI and exterior
mounted disconnect.
1.
Red (hot) wire connected to #2 on terminal block.
2.
Black (hot) wire connected to #3 on terminal block.
3.
White (neutral) wire connected to #4 on terminal block.
4.
Green (ground) wire routed through plastic enclosure and secured to
exterior bonding lug.
installation ins tructions
1
2
3
4
12

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents