Toro ProForce Debris Service Manual page 59

Table of Contents

Advertisement

PRELIMINARY – For Toro Distributor and Toro Company use only.
8. Remove four (4) cap screws that secure bearing
holder to inner housing.
9. Slide rotor shaft and bearing holder assembly from
inner housing.
10.Remove four (4) flange head screws that secure
front bearing cap to bearing holder. Remove bearing
holder from rotor shaft assembly.
11. Remove bearings from rotor shaft:
A. Remove outer retaining rings from shaft.
B. Press bearings from shaft.
C. Remove front bearing cap and inner retaining
rings from shaft if necessary.
12.Inspect rotor shaft and bearing bores of bearing
holder and inner housing for wear or damage. Replace
parts as necessary.
Installation (Fig. 6)
1. Install bearings onto rotor shaft:
A. Install inner retaining rings into shaft groove if
they were removed.
B. Make sure that front bearing cap (item 6) is
placed on rotor shaft between bearing locations.
C. Install bearings onto shaft by pressing on inner
race. Make sure that bearings are seated against in-
ner retaining ring.
D. Install outer retaining rings to secure bearings on
shaft.
2. Clean bearing bores of bearing holder and inner
housing with brake parts cleaner or similar non−oily
cleaner. After cleaner dries completely, apply Loctite
Primer N 7649 (or equivalent) to bearing bores. Allow
Primer to dry completely.
3. Thoroughly clean OD of bearings on rotor shaft. Ap-
ply Loctite Product 641 (or equivalent) to OD of both
bearings.
4. Slide bearing holder onto bearing on rotor shaft.
Position front bearing cap (item 6) to bearing holder and
secure with four (4) flange head screws.
ProForce Debris Blower
5. Install rotor shaft assembly into inner housing mak-
ing sure that bearing is fully seated in housing bearing
bore. Make sure that bearing holder slides fully into in-
ner housing and that rotor shaft rotates freely.
6. Install four (4) cap screws to secure bearing holder
to inner housing. Tighten screws in three (3) equal steps
and in a crossing pattern. Final torque on screws should
be from 180 to 210 in−lb (21 to 23 N−m).
7. Install plug (item 9) into inner housing.
8. Install rotor assembly (see Rotor Assembly Installa-
tion in this section).
9. Install blower drive shaft (see Blower Drive Shaft
Installation in this section).
10.Install top grill to machine (Fig. 7).
11. Install nozzle pulley and nozzle to rear of outer hous-
ing (see Nozzle Assembly Installation) in this section).
12.Connect negative battery cable to negative battery
terminal. Tighten nut that secures battery cable from 10
to 15 ft−lb (14 to 20 N−m). Make sure that battery cover
is secured.
1
2
1
5
3
1. Screw
2. Washer
3. Flange nut
Page 5 − 9
4
Figure 7
4. Top grill
5. Side grill
Blower Assembly
1
3
2
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents